|
Case Number:
|
|
BLD2022-00521
|
Received Date:
|
|
9/6/2022
|
|
Description:
|
|
CELL TOWER MODIFICATION-6409(a) modification to existing T-Mobile wireless facility to remove and replace antennas on the tower and ground equipment. Scope of work includes: Tower scope of work: Remove (2) antennas; Install (2) antennas, (1) HCS 2.0 J-Box w/ breakout pendant, (1) 1-1/2" hybrid cable. Ground scope of work: Remove Existing SSC Cabinet, (1) AMOE Rack, (1) 100A PPC Cabinet; Relocate (1) 200A Meter; Install (1) Purcell HPL3 Cabinet W /: (1) voltage booster W /(3) amplifiers & (1) CSR IXRE V2 router; Install (1) Purcell LB3 Battery Cabinet W / (4) battery strings; Install (1) HCS 2.0 J-Box, (1) 8'-o" H-frame, (1) Vertiv cube, (1) 200A PPC cabinet, (1) CIENA box, (1) tech light, (1) grip step over, (1) 24" ICE bridge W / 12" diving board.
|
Issued Date:
|
|
11/28/2022
|
|
Case Status:
|
|
A
|
Expiration Date:
|
|
11/28/2023
|
| | |
Final Date:
|
|
|
|
Permit Applicant:
|
|
 
 
POPE RESOURCES
|
|
Parcel No:
|
|
801122002
|
|
Case Notes:
|
|
|
|
Building Type:
|
|
COM
|
Water Supply:
|
|
|
Existing:
|
|
|
Main Fl:
|
|
|
|
Type of Improvement:
|
|
ALT
|
Sewage Disposal:
|
|
|
Proposed:
|
|
|
Add Fl:
|
|
|
|
Type of Construction:
|
|
U
|
|
|
|
Total:
|
|
|
Heated Basement:
|
|
|
|
Units:
|
|
|
|
|
|
|
|
|
Unheated Basement:
|
|
|
|
Height:
|
|
|
|
|
|
|
|
|
Other:
|
|
|
|
Stories:
|
|
|
|
|
|
|
|
|
Garage/Carport:
|
|
|
|
Heat Type:
|
|
|
|
|
|
|
|
|
Decks:
|
|
|
|
Estimated Cost:
|
|
|
|
Existing:
|
|
|
|
ShBnkHt:
|
|
|
|
LndBnkHt:
|
|
|
|
Make:
|
|
|
|
Proposed:
|
|
|
|
ShSetBk:
|
|
|
|
LndSetBk:
|
|
|
|
Yr:
|
|
|
|
Total:
|
|
|
|
|
|
|
|
|
|
|
|
Size:
|
|
|
|