|
Case Number:
|
|
BLD2022-00514
|
Received Date:
|
|
9/2/2022
|
|
Description:
|
|
CELL TOWER MODIFICATION. SCOPE OF WORK TO INCLUDE - TOWER: REMOVE (3) ANTENNAS, INSTALL (3) ANTENNAS, lNSTALL (1) HCS 2.0J-BOX W/ BREAKOUT PENDANT, INSTALL (I) 1-1/2" HYBRID CABLE; GROUND: REMOVE (I) EXISTlNG CABINET - SSC CABINET, REMOVE (1) AMOB RACK, REMOVE (1) PPC/TF LCO CABINET, INSTALL (1) PURCELL HPL3 CABINET W/ CSR IXRE V2 ROUTER, INSTALL (1) PURCELL LB3 BATfERY CABINET W (4) BATTERY STRINGS, INSTALL (1) HCS 2.0 J-BOX, INSTALL 200A PPC CABINET W/ CAMLOK CONNECTlON, INSTALL VERTIV CUBE, INSTALL (I) H-FRAME, INSTALL (1) 14'-0"x24" ICE BRIDGE w/ 12" DIVING BOARD, INSTALL (1) 8'ยท0"x24" ICE BRIDGE, INSTALL (1) TECH LIGHT
|
Issued Date:
|
|
10/28/2022
|
|
Case Status:
|
|
A
|
Expiration Date:
|
|
10/28/2023
|
| | |
Final Date:
|
|
|
|
Permit Applicant:
|
|
 
 
POPE RESOURCES
|
|
Parcel No:
|
|
901042001
|
|
Case Notes:
|
|
|
|
Building Type:
|
|
COM
|
Water Supply:
|
|
|
Existing:
|
|
|
Main Fl:
|
|
|
|
Type of Improvement:
|
|
ALT
|
Sewage Disposal:
|
|
|
Proposed:
|
|
|
Add Fl:
|
|
|
|
Type of Construction:
|
|
5N
|
|
|
|
Total:
|
|
|
Heated Basement:
|
|
|
|
Units:
|
|
|
|
|
|
|
|
|
Unheated Basement:
|
|
|
|
Height:
|
|
|
|
|
|
|
|
|
Other:
|
|
|
|
Stories:
|
|
|
|
|
|
|
|
|
Garage/Carport:
|
|
|
|
Heat Type:
|
|
|
|
|
|
|
|
|
Decks:
|
|
|
|
Estimated Cost:
|
|
25000.00
|
|
Existing:
|
|
|
|
ShBnkHt:
|
|
|
|
LndBnkHt:
|
|
|
|
Make:
|
|
|
|
Proposed:
|
|
|
|
ShSetBk:
|
|
|
|
LndSetBk:
|
|
|
|
Yr:
|
|
|
|
Total:
|
|
|
|
|
|
|
|
|
|
|
|
Size:
|
|
|
|