|
Case Number:
|
|
BLD2015-00024
|
Received Date:
|
|
1/27/2015
|
|
Description:
|
|
Boiler Mact Project construction work consistes of adding a 28' x 30' electrical room for breakers, low voltage , switch gear, transformers, relays and wiring for control and power supply of the Mact electrostatic precipitator.
there is also the operating equipement for the Boiler Mact Project which consists of above grade, free standing and self-supported columns built from the ground level. This existing area is already paved concrete and asphalt. The estimated equipment footprint area is 60' to 120'.
|
Issued Date:
|
|
4/8/2015
|
|
Case Status:
|
|
F
|
Expiration Date:
|
|
4/8/2016
|
| | |
Final Date:
|
|
12/1/2015
|
|
Permit Applicant:
|
|
 
 
PORT TOWNSEND PAPER CORP
|
|
Parcel No:
|
|
001152006
|
|
Case Notes:
|
|
|
|
Building Type:
|
|
COM
|
Water Supply:
|
|
|
Existing:
|
|
|
Main Fl:
|
|
|
|
Type of Improvement:
|
|
NEW
|
Sewage Disposal:
|
|
|
Proposed:
|
|
|
Add Fl:
|
|
|
|
Type of Construction:
|
|
|
|
|
|
Total:
|
|
|
Heated Basement:
|
|
|
|
Units:
|
|
|
|
|
|
|
|
|
Unheated Basement:
|
|
|
|
Height:
|
|
|
|
|
|
|
|
|
Other:
|
|
|
|
Stories:
|
|
|
|
|
|
|
|
|
Garage/Carport:
|
|
|
|
Heat Type:
|
|
|
|
|
|
|
|
|
Decks:
|
|
|
|
Estimated Cost:
|
|
7413000.00
|
|
Existing:
|
|
|
|
ShBnkHt:
|
|
|
|
LndBnkHt:
|
|
|
|
Make:
|
|
|
|
Proposed:
|
|
|
|
ShSetBk:
|
|
|
|
LndSetBk:
|
|
|
|
Yr:
|
|
|
|
Total:
|
|
|
|
|
|
|
|
|
|
|
|
Size:
|
|
|
|