Case Number: BLD2006-00398 Received Date: 7/12/2006
Description: Fred Hill Material Inc. (FHM) leases from Pope Resources who owns the 72,000 acre Hood Canal Tree Farm. FHM mineral extraction and processing areas (referred to as the Shine Hub) totals 151.5 acres and is designated a Mineral Resource Overlay District (MRL). The current proposal by FHM is to add 20 acres of additional mineral extraction area (pit area), adjacent to the Shine Hub. These areas would be comprised of four 5 acre segments (N, O, P, & Q). This would bring the total area to 191.5 acres currently regulated under a DNR Reclamation permit. This area has been logged by Pope Resources through Forest Practice Application (FPA). The additional pit area is located in a Commercial Forest designation, where mining is a permitted activity provided that no more than 10 acres is disturbed at any one time. Disturbed area is defined by RCW 78.44.031(5) and is determined by the WA State Department of Natural Resources through their Reclamation Permit. The current mineral extraction is occurring in Segments L & M (approved through MLA 05-630 on December 29, 2005), where a good deposit of gravel has been located. This area is located behind a berm south of the Shine Hub. The proposed expansion (Segments N,O,P,& Q) are located southwest of Segments L & M(see Reclamation Sequence Map). There is a large ridge located to the south and east of this area. The extraction would start from the east and proceed from north to south. The maximum depth of mining within the proposed expansion would be approximately 50 feet. The finished floor of the mine will have a vertical separation of over 100 feet from the seasonal high groundwater table (see cross sectional map for more details). After the area is mined stored topsoil would be spread over the area, forest debris spread over the area, a cover crop established, and then replanted with Douglas Fir for the subsequent use for timber production. It is anticipated that all of the mineral extraction (segments L,M,N,O,P& Q) south of the Shine Hub would be reclaimed in by December 2007 (per the Reclamation Sequence Map). The Wahl Extraction area (approved through MLA 03-377 on July 18, 2005) is located near Thorndyke Creek and its unnamed Tributary. The applicant has indicated that they are not seeking to mine within the Wahl Extraction Area at the present time because they want to obtain base line surface and groundwater monitoring data before mineral extraction occurs. This will help ensure that the impacts associated with mineral extraction can be separated from the natural hydraulic conditions Jefferson County has a Stormwater Permit to review and is the lead agency for the environmental review of the proposal under SEPA. Jefferson County is issuing a MDNS for this proposal. The threshold determination for this proposal incorporates the Final Modified MDNS issued for Ace Paving Conditional Use Application (ZON 98-41) within the 144 acre mineral extraction and processing area, which was issued by Jefferson County DCD on June 1, 1999. Documents reference in this notice are available the Jefferson County DCD during office hours. The applicant will require an amended WA State DNR Reclamation Permit and an amended NPDES General Sand and Gravel permit from the WA State Department of Ecology. Issued Date: 9/26/2006
Case Status: S2 Expiration Date: 9/26/2007
Final Date:
Permit Applicant:     POPE RESOURCES
Parcel No: 721062001
Case Notes:
Building Type: SWT Water Supply: Existing: Main Fl:
Type of Improvement: C&G Sewage Disposal: Proposed: Add Fl:
Type of Construction: Total: Heated Basement:
Units:
Unheated Basement:
Height: Other:
Stories: Garage/Carport:
Heat Type: Decks:
Estimated Cost:

Existing: ShBnkHt: LndBnkHt: Make:
Proposed: ShSetBk: LndSetBk: Yr:
Total: Size: